KB'S DONNER
Sire:  LONESOME CRY
Dam:  FUZZYS BOBCAT
Left Tattoo:  37550
Right Tattoo: 46G
Sex/Color: F / W.BD.
Whelp Date: 2006-04-28
Starts: SN-20-6-0-5-2
 

Race Lines for: 2009
Nov 9  A6 SN  550  30.67      X-   48.80 Hit, Fell 1st,D.N.F.
Nov 2  A7 SN  550  31.29  3- 4.5  31.59  3.50 Early Bid, Nice Try
Oct 26  A9 SN  550  31.04  3- 6.5  31.49  4.50 Along For Show Rl
Oct 19  A12 SN  550  31.05  6- 4.5  31.38  9.20 Slight Bump 1st Turn
Oct 14  A6 SN  550  31.30  1- .5  31.30  7.60 Held Narrow Margin
Oct 7  A1 SN  550  31.91  6- 32.34  1.00 Varied Little Inside
Oct 2  A3 SN  550  31.51  6- 6.5  31.96  8.10 Never Improved Rail
Sep 25  E14 SN  550  31.27  7- 6.5  31.72  6.20 Forced Out 1st Turn
Sep 18  E3 SN  550  30.79  3- 31.28  9.10 Up For Show Inside
Sep 12  A14 SN  550  31.40  6- 10  32.11  6.20 Bumped Twice 1st Tr
Sep 5  A12 SN  550  31.76  1- 31.76  5.30 Drew Out In Strch Md
Aug 29  A9 SN  550  31.46  4- 6.5  31.92  2.70 Wd 1st, Steadily
Aug 14  E9 SN  550  30.76  4- 6.5  31.22  8.80 Steady Drive, Rail
Aug 7  A12 SN  TA  550  30.58  1- 3.5  30.58  3.80 Took Over Far Turn
Jul 31  E9 SN  TA  550  30.81  5- 31.08  5.20 Varied Little Midtrk
Jul 25  A14 SN  TA  550  31.01  1- 31.01  6.60 Stretch Win Inside
Jul 20  A9 SN  TA  550  30.51  3- 6.5  30.95  2.50 Thru On Rl For Show
Jul 15  A14 SN  TA  550  31.22  1- 1.5  31.22  2.00 Constantly Driving
Jul 6  A7 SN  TB  550  31.34  1- nk  31.34  4.60 Just Up, Inside
Jul 1  A12 SN  TB  5/16  31.01  3- 4.5  31.33  5.60 Drove Thru Rivals
Jun 25  E12 SN  5/16  30.99  5- 20.5  32.41  8.10 No Threat, Inside
Jun 18  E8 SN  5/16  31.11  1- 31.11  3.10 Box To Wire Inside
Jun 12  A8 SN  5/16  31.15  3- 4.5  31.47  3.90 Drove Thru Rivals
Jun 6  A8 SN  5/16  31.49  6- 5.5  31.89  5.60 Tiring Late Inside
Jun 1  A3 SN  TB  5/16  30.75  7- 10  31.44  14.80 No Factor, Inside
May 23  E3 SN  TB  5/16  31.09  6- 8.5  31.70  7.80 Evenly Midtrack
May 16  A3 SN  TB  5/16  30.62  6- 11.5  31.41  3.70 Weakened Strch Rl
May 9  E2 SN  5/16  30.80  2- 3.5  31.03  3.30 Saved Place, Rail
May 2  E12 SN  TB  5/16  30.77  5- 10  31.48  5.20 Varied Little Rail
Apr 25  E9 SN  TA  5/16  30.35  5- 14.5  31.37  5.80 Outfinished, Inside